Introduction

Building commissioning is a process that focuses on ensuring the design and construction of buildings meet the original intent of their owners. Commissioning is achieved through a team effort involving all parties involved in the project, including architects, builders, engineers and building users. The main goal of building commissioning is to reduce energy costs by making sure buildings use less energy than originally planned for. It also helps avoid problems such as mold growth or poor air quality caused by moisture or humidity build-up within walls during construction. Read this article shared by Local law 84 experts.

What is building commissioning?

Building commissioning is the process of ensuring that a building is constructed correctly and works as intended. Commissioning involves testing all systems and components, and ensuring they are properly designed to work together in a dynamic system.

Commissioning can save you money and increase efficiency by finding defects early in the construction process. It also helps identify opportunities for improvement during project planning, rather than after completion when it’s too late to make changes.

The benefits of building commissioning include:

  • Increased comfort – buildings are tested to ensure they are comfortable before occupancy; owners will know if there are any issues with temperature control or humidity levels before moving in
  • Better performance – energy-efficiency measures such as insulation or heating/cooling equipment will operate at peak efficiency once commissioned

Who is involved in the commissioning process?

The owner, architect and general contractor are usually the main stakeholders in a building project. The owners want to ensure that they receive value for money on their investment, while the architect ensures that the project meets their design intent. The general contractor is responsible for managing all aspects of the construction process including labour costs, scheduling issues, etc.

The commissioning agent is tasked with overseeing all aspects of commissioning during construction. This includes appointing a commissioning team who will carry out tests at specific stages during construction and ensure compliance with codes or industry standards. They also manage implementation of corrective actions where necessary during testing period to ensure final completion meets code requirements before handing over keys/certificates to owner/architect/project manager etc., who will then take ownership over these responsibilities until handover date arrives (usually within 30 days after occupancy date).

Why do you need building commissioning?

There are many reasons why you need building commissioning. What are they?

  • To ensure the building performs as expected. This is especially important when the building is new or has undergone significant renovation. If you don’t get it right, there could be problems with things such as heating and cooling, plumbing leaks and other issues that will cost you money in repairs down the road.
  • To ensure that everyone who lives or works in a building is safe from harm at all times (e.g., during an earthquake). Even if your city’s code does not require mandatory building commissioning for such things as seismic assessment before construction or occupancy permits are issued; we strongly recommend that you have us perform these services because it’s always better to be safe than sorry!
  • To make sure that energy efficiency of your buildings do not exceed certain levels defined by various agencies around the world such as ASHRAE 90.1 and LEED v4 which define minimum requirements based on different climate zones around globe where they will operate most often located according to latitude/longitude coordinates given here: https://www​drupal-7​nodes/​[tab_id]/langs/​en-US/​map_latlngs​

What happens during the commissioning process?

  • Commissioning is a series of tests, inspections and audits that are conducted over the course of several weeks.
  • If a building’s climate control system is not working properly, it can cause major issues for the occupants’ health and productivity, as well as negatively impact the building’s value.
  • Most importantly, it ensures that your new building is safe and energy efficient

Building Commissioning has many benefits, this article describes how it works and some of its benefits.

Building commissioning is a process that assures quality, performance and long-term durability of building systems.

Building commissioning is also referred to as “architectural commissioning.” It involves analyzing the needs of the users/occupants of a building and ensuring that those needs are met by designing a system for optimum performance with minimum cost. In this way, architectural commissioning is similar to other forms of building testing. However, it differs in that it looks at how each component works together to create a whole system—or what we think of as an entire building—rather than specific components within that system.

The main difference between architectural commissioning and other types of commissioning (such as mechanical or electrical) is in its focus on optimizing energy efficiency through the design process rather than retrofitting existing structures after construction has taken place

Conclusion

Building Commissioning is a process that is used to ensure that the building is built correctly and will meet the owner’s needs. There are many benefits in doing so, including:

It helps ensure that the building will function properly

It can save money during construction by identifying problems early on in the process before they become expensive repairs later on. . This Article is written by nycbuildingbenchmarking.